Canning Town, London

Whilst achieving the required U-values the architect was looking for a stepped finish on this internal walkway with differing colours on feature panels.  The Envirowall Rail System onto an SFS substrate was used with differing thickness of insulation to achieve the feature bays.
We used:

Envirowall Rails
Envirowall Insulation
Envirowall Basecoat
Envirowall Mesh
Envirowall Primer
Envirowall Topcoat

Click here for more information on Insulated Render

Return to Case Studies